Publicación: Estudio de factibilidad para la creación de un centro de salud amigable para adolescentes y jóvenes en el municipio de Montería -Córdoba – 2021
Portada
Citas bibliográficas
Código QR
Director
Autor corporativo
Recolector de datos
Otros/Desconocido
Director audiovisual
Editor/Compilador
Editores
Tipo de Material
Fecha
Palabras claves
Materia
Cita bibliográfica
Título de serie/ reporte/ volumen/ colección
Es Parte de
Resumen en inglés
The work consists of a feasibility study for the creation of an adolescent and youth friendly health center in the municipality of Monteria that will provide general and specialized medical consultation services in gynecology, sexual and reproductive health, family planning, psychology, nutrition and physical well-being based on a highly qualified human team, resources, technology and infrastructure, which requires adequate facilities for continuous care located near 27th Street in Monteria, as it is a strategic area where several important health institutions of the city are located, in addition to the ease of access for people coming from other parts of the department and the city. The institution will be adapted to cover the prevalent needs of the users, providing safe spaces where they will receive a differentiated integral professional assistance, contributing to guarantee sexual and reproductive rights while promoting youth participation in recreational, cultural, artistic and sports spaces that contribute to the healthy development, physical and mental wellbeing. For this purpose, a measurement of the dynamic conditions between supply and demand was carried out through the implementation of a market study, characterizing the current state of the market conditions and its potential in the short, medium and long term. Subsequently, a financial study was implemented to determine the investment necessary for the start-up of the project according to its cost structure and estimated cash flow, projecting a gross income of $843,763,200 per year, which makes 13 possible the collection of the annual investment of $522,470,223, generating a net profit of $252,977,546, representing an internal rate of return (IRR) of 39.13%, achieving the recovery of the entire initial investment in an estimated 30 months.